Grosvenor’s TBM will be used to build two drifts on the project – one for the coal conveyor which will transport coal from the underground longwall to the stockpile area on the surface and another for people and equipment to access the underground once the mine is operational.  Redpath Australia is assembling, commissioning and supporting the TBM mining. Mining Magazine